Selected experience

Track Records

Engineered, built and delivered: from technology in the field to studies, process packages and support after handover.

The record in short

The record, technology by technology.

3 LPPU installations

Offshore Malaysia across two fields, the first in 2014.

3 LP-CRS units

Installed offshore Malaysia between 2017 and 2019.

Sep-iSYS™ Desander

Field proven, installed offshore Malaysia. Supplied from September 2017. Intellectual property jointly owned with PETRONAS.

10+ countries

Engineering for oil and gas assets in more than 10 countries.

Featured project

PETRONAS Floating LNG 2 (PFLNG DUA).

Engineering and procurement of the 900# Sep-iSYS™ inlet package, three trains, 2014 to 2017, offshore Sabah.

The Sep-iSYS™ Desander
Loose items
Expander pipe, inlet heater and inlet separator.
Skid packages
Desander, accumulator and sand cleaning system.
Technology
Sep-iSYS™, jointly developed and owned with PETRONAS.

In the field

Our technology, installed and working.

LPPU2014 and 2016 · Offshore MalaysiaThree offshore installations across two fields, the first in 2014.
LP-CRS2017 to 2019 · Offshore MalaysiaThree units installed offshore Malaysia, field-operated between 2017 and 2024.
Sep-iSYS™ DesanderFrom 2017 · Offshore MalaysiaField proven, installed offshore Malaysia. Supplied from September 2017.
Sep-iSYS™ extended well test module2013 · Offshore MalaysiaOur first field deployment: the extended well test module goes offshore.
Crude stabilisation module2014 to 2015 · MalaysiaTopside facilities with a Sep-iSYS™ crude stabilisation unit, from FEED through EPC.
Crude stabilisation module2022 to 2025 · IndonesiaEngineered in Kuala Lumpur to the client’s design and fabricated in Indonesia, with load-out completed in 2024.

Clients and partners

Who we have worked with.

  • PETRONAS
  • Bumi Armada
  • Vestigo Petroleum
  • ENEOS Xplora
  • MISC
  • Petrofac
  • Technip Energies
  • Honeywell UOP
  • IPC Malaysia
  • ExxonMobil
  • Petrobras
  • McDermott
  • Yinson
  • Matahio Energy
  • Jadestone Energy
  • Ranhill Worley
  • Adaptive Process Solutions (international partner)

Where the work is

The record, country by country.

Where our work isA map of the countries in the lists: Malaysia, Vietnam, Australia, India, Indonesia, Angola, Namibia, Pakistan, Saudi Arabia, Singapore, Philippines, Nigeria, Brazil.MalaysiaVietnamAustraliaIndiaIndonesiaAngolaNamibiaPakistanSaudi ArabiaSingaporePhilippinesNigeriaBrazil

Showing: All countries

EPC and packages

EPC and packages
YearCountryScopeTechnology
2012MalaysiaAJK KMSE, offshore SarawakSep-iSYS™ early production system for the Nautica Muar FPSO. Client: MTC Engineering / PETRONAS Carigali. Scope: EPC.Sep-iSYS™
2014MalaysiaWest Lutong, offshore SarawakSep-iSYS™ Low Pressure Production Unit (LPPU). Client: PETRONAS Carigali (SKO). Scope: EPC.LPPU
2014MalaysiaAnjung Kecil, offshore SarawakSep-iSYS™ crude stabilisation unit for the MaMPU FPSO. Client: MISC. Scope: EPC.Crude stabilisation
2014MalaysiaRotan, offshore SabahThree trains of the Sep-iSYS™ inlet production system, with the Sep-iSYS™ sand removal and sand wash systems. Client: PETRONAS. Scope: engineering and procurement.Sep-iSYS™
2016MalaysiaAngsi, offshore Peninsular MalaysiaSep-iSYS™ Low Pressure Production Unit (LPPU), two units. Client: PETRONAS Carigali (PMO). Scope: EPC.LPPU
2016MalaysiaAnjung Kecil, offshore SarawakLow Pressure Condensate Recovery System (LP-CRS) for the MaMPU FPSO. Client: MISC. Scope: EPC.LP-CRS
2017MalaysiaOphir, offshore Peninsular MalaysiaSep-iSYS™ crude stabilisation unit for the Ledang FPSO. Client: MTC Engineering. Scope: EPC.Crude stabilisation
2017Malaysiaacross MalaysiaUmbrella contract for the supply and services of desander equipment and its accessories. Client: PETRONAS Carigali. Scope: concept, FEED, detailed design, EPC and operation.Sep-iSYS™ Desander
2017MalaysiaBokor, offshore SarawakSep-iSYS™ CSRS bulk desander with a sand handling system. Client: PETRONAS Carigali (SKO). Scope: EPC.Sep-iSYS™ Desander
2018MalaysiaTembikai, offshore Peninsular MalaysiaLow Pressure Condensate Recovery System (LP-CRS). Client: Vestigo Petroleum. Scope: EPC.LP-CRS
2018MalaysiaNC3, offshore SarawakCondensate mercury removal skid. Client: HYDAC Technology / Sapura Energy. Scope: EPC.Process package
2018PhilippinesGalocLow Pressure Condensate Recovery System (LP-CRS) for the FPSO Intrepid. Client: Matahio Energy. Scope: EPC.LP-CRS
2023IndonesiaForelCrude stabilisation module for the Marlin Natuna FPSO. Client: Consortium PT Hanochem Tiaka Samuedra / MedcoEnergi. Scope: EPC.Crude stabilisation
2023MalaysiaWest Lutong, offshore SarawakLow Pressure Production Unit and gas recovery system. Client: PETRONAS Carigali (SKO). Scope: EPCIC.LPPU
2023MalaysiaHelang, offshore SarawakSep-iSYS™ CSRS compact desander. Client: ENEOS Xplora. Scope: FEED and EPC.Sep-iSYS™ Desander
2024VietnamBlock BCondensate stabilisation package. Client: McDermott / Petrovietnam PQPOC. Scope: EPC.Condensate stabilisation

Engineering and studies

Engineering and studies
YearCountryScopeTechnology
2010VietnamSep-iSYS™ and topside facilities of the TGT FPSO. Client: HLJOC. Scope: concept, FEED and detailed design.Sep-iSYS™
2012IndiaSep-iSYS™ and topside facilities of the D1 FPSO. Client: ONGC. Scope: concept, FEED and detailed design.Sep-iSYS™
2012AustraliaBalnaves, Western AustraliaBalnaves field FPSO. Client: Apache Energy. Scope: concept, FEED and detailed design.Engineering
2013Malaysiaoffshore SarawakSep-iSYS™ Low Pressure Production Unit. Client: PETRONAS Carigali (SKO). Scope: concept, FEED and detailed design.LPPU
2013Malaysiaoffshore SabahSamarang redevelopment project phase 2 (SMP-C). Client: PETRONAS Carigali (SBA). Scope: detailed design.Engineering
2013MalaysiaKinabalu, offshore SabahKinabalu platform debottlenecking. Client: Talisman Malaysia. Scope: concept.Engineering
2013IndonesiaKE-38, offshore MaduraMadura temporary production facility. Client: Gryphon Energy Asia Pacific. Scope: concept and detailed design.Engineering
2014MalaysiaK-5, offshore SarawakDRCF and GDU for pre-treatment and CO₂. Client: Honeywell UOP. Scope: concept, FEED and detailed design.Engineering
2014AngolaCobalt piping and CAD drafting. Client: Bumi Armada. Scope: concept, FEED and detailed design.Engineering
2014MalaysiaTanjong Baram, offshore SarawakTopside engineering. Client: 2H Offshore Engineering. Scope: FEED and detailed design.Engineering
2014VietnamTGT FPSOTGT FPSO capacity check and debottlenecking study (phase 1). Client: Bumi Armada. Scope: adequacy check.Engineering
2014VietnamTinh Gia district, Thanh Hóa provinceLauncher and receiver for the crude oil import pipeline. Client: Wood Group Kenny. Scope: FEED.Engineering
2014NamibiaKuduKudu gas to power project. Client: Bumi Armada. Scope: concept, FEED and detailed design.Engineering
2015MalaysiaBertam, Peninsular MalaysiaEngineering services contract for Lundin Malaysia B.V. Client: Lundin Malaysia B.V. Scope: umbrella engineering.Engineering
2015IndonesiaMadura StraitEngineering consultancy for the Husky Madura project. Client: Bumi Armada. Scope: detailed design.Engineering
2015SingaporeComputational fluid dynamics (CFD) and finite element analysis (FEA). Client: Jimmy Lea Chartered Engineers. Scope: detailed design.Engineering
2015PakistanGambat South BlockPPL Separex project. Client: Honeywell UOP. Scope: detailed design.Engineering
2015Saudi ArabiaTAIF project. Client: KNM Process. Scope: concept.Engineering
2015MalaysiaBokor, offshore SarawakWellhead platform for the Bokor phase 3 redevelopment project. Client: Muhibbah Engineering / PETRONAS. Scope: FEED design competition.Engineering
2017SingaporeShell Bukom APSA T7Engineering and pipe stress support. Client: PEC. Scope: detailed design.Engineering
2017MalaysiaOphir, offshore Peninsular MalaysiaUmbrella contract for design engineering services. Client: Ophir Production. Scope: umbrella engineering.Engineering
2018MalaysiaTapis, offshore Peninsular MalaysiaLow Pressure Condensate Recovery System (LP-CRS). Client: ExxonMobil Exploration and Production. Scope: concept and FEED.LP-CRS
2018MalaysiaTemana, offshore MalaysiaLow Pressure Condensate Recovery System (LP-CRS). Client: PETRONAS Carigali (SKO). Scope: concept and FEED.LP-CRS
2018MalaysiaSarawakPortable container station (PCS) dispenser skid. Client: OGPC. Scope: detailed design.Engineering
2018MalaysiaPort DicksonUltra low sulphur automotive diesel oil (ULSADO) project, Petron distillate Unionfining process. Client: Honeywell UOP. Scope: FEED.Engineering
2019MalaysiaWest Desaru, offshore Peninsular MalaysiaWest Desaru Low Pressure Condensate Recovery System (LP-CRS). Client: Petrofac. Scope: FEED.LP-CRS
2019VietnamNam Du and U MinhFPSO topside facility for the Nam Du and U Minh development. Client: HBA Offshore. Scope: FEED.Engineering
2019IndiaFPSO topside for the NELP block KG-DWN-98/2 development project. Client: Kavin Engineering / SPOG. Scope: detailed design.Engineering
2019MalaysiaBekok-A, offshore Peninsular MalaysiaLow Pressure Condensate Recovery System (LP-CRS). Client: Deleum Primera / PETRONAS Carigali (PMA). Scope: concept and FEED.LP-CRS
2019MalaysiaBertam, offshore Peninsular MalaysiaProduced water system upgrade (PWSU) for the wellhead platform and FPSO topside. Client: EPOMS. Scope: concept, FEED and detailed design.Engineering
2019MalaysiaWest Desaru, offshore Peninsular MalaysiaLow Pressure Condensate Recovery System (LP-CRS). Client: Petrofac. Scope: concept and FEED.LP-CRS
2019AustraliaNorthern Endeavour FPSOVery low sulphur fuel oil (VLSFO) system for an FPSO. Client: Northern Oil and Gas Australia. Scope: concept and FEED.Engineering
2020MalaysiaTemana, offshore MalaysiaInstallation of the Low Pressure Condensate Recovery System (LP-CRS) for Temana A. Client: PETRONAS Carigali (PCSB). Scope: detailed design.LP-CRS
2020MalaysiaSabahFPSO Kikeh greenhouse gas emission reduction study. Client: MISC. Scope: concept select.Engineering
2020NigeriaOkwokFPSO for the Okwok field development. Client: HBA Offshore. Scope: adequacy check.Engineering
2020Malaysiaoffshore TerengganuBerantai gas development study and basic engineering. Client: Vestigo Petroleum. Scope: feasibility study and basic engineering.Engineering
2021NigeriaEngineering for the Agogo full field FPSO project. Client: Shapoorji Pallonji Group. Scope: FEED design competition.Engineering
2021BrazilSeawater injection, produced water treatment module and TEG package. Client: National Oilwell Varco / SBM. Scope: detailed design.Engineering
2021MalaysiaBentaraMaMPU 1 redeployment from the AJK field to the Bentara field. Client: MISC. Scope: detailed design.Engineering
2021MalaysiaLarutBasic engineering for the Larut infill. Client: Vestigo Petroleum. Scope: basic engineering design.Engineering
2021MalaysiaLimbayong FPSOLimbayong flare study. Client: Yinson. Scope: basic engineering design.Engineering
2022BrazilSeawater injection, produced water treatment module and TEG package. Client: National Oilwell Varco / SBM. Scope: detailed design.Engineering
2023BrazilProcess engineering support for the P-82 FPSO topsides. Client: Ranhill Worley / Petrobras. Scope: detailed design.Engineering
2023PhilippinesFeasibility study for an LP-CRS on the FPSO Intrepid. Client: Matahio Energy. Scope: feasibility study and basic engineering.LP-CRS
2023AustraliaBasic engineering design of the reinjection compression system upgrade for the Montara Venture FPSO. Client: Jadestone Energy. Scope: basic engineering design.Engineering
2024MalaysiaTemana, offshore MalaysiaEngineering services for an LPPU and gas recovery system. Client: PETRONAS Carigali. Scope: FEED.LPPU
2025IndonesiaNorth SumatraTopside FEED for the FPSO Tangkulo. Client: Bumi Armada / Mubadala Energy. Scope: FEED.Engineering
2025VietnamBlock BEngineering for the separator sand removal system. Client: Alpha ECC / McDermott. Scope: detailed design.Engineering
2026MalaysiaSarawakProcess capacity screening for the M1 facilities, Kenyalang tie-in concept. Client: Ankaa Consulting / TotalEnergies. Scope: adequacy check.Engineering
LPPU package installed offshore
LPPU package installed offshore.

Our technology record

A proven record behind every technology.

Enhanced LPPU™ is an enhancement of the LPPU platform: three offshore LPPU installations across two fields, the first in 2014, now re-engineered with the liquid piston. Enhanced LP-CRS™ carries forward condensate-recovery experience. The Sep-iSYS™ Desander brings NGLTech’s separation logic into produced-sand duties, under intellectual property jointly owned with PETRONAS.

After delivery

The operating phase is part of the record.

01

Commissioning

Connect design intent to the real plant and its operating procedures.

02

Performance review

Read the operating data and resolve what it is actually saying.

03

Operator readiness

Training, documentation and clear handover around the package.

04

Lifecycle action

Maintenance, spares, upgrades and planned removal when required.