Selected experience
Track Records
Engineered, built and delivered: from technology in the field to studies, process packages and support after handover.
The record in short
The record, technology by technology.
3 LPPU installations
Offshore Malaysia across two fields, the first in 2014.
3 LP-CRS units
Installed offshore Malaysia between 2017 and 2019.
Sep-iSYS™ Desander
Field proven, installed offshore Malaysia. Supplied from September 2017. Intellectual property jointly owned with PETRONAS.
10+ countries
Engineering for oil and gas assets in more than 10 countries.
Featured project
PETRONAS Floating LNG 2 (PFLNG DUA).
Engineering and procurement of the 900# Sep-iSYS™ inlet package, three trains, 2014 to 2017, offshore Sabah.
The Sep-iSYS™ Desander- Loose items
- Expander pipe, inlet heater and inlet separator.
- Skid packages
- Desander, accumulator and sand cleaning system.
- Technology
- Sep-iSYS™, jointly developed and owned with PETRONAS.
In the field
Our technology, installed and working.
Where the work is
The record, country by country.
Showing: All countries
EPC and packages
| Year | Country | Scope | Technology |
|---|---|---|---|
| 2012 | MalaysiaAJK KMSE, offshore Sarawak | Sep-iSYS™ early production system for the Nautica Muar FPSO. Client: MTC Engineering / PETRONAS Carigali. Scope: EPC. | Sep-iSYS™ |
| 2014 | MalaysiaWest Lutong, offshore Sarawak | Sep-iSYS™ Low Pressure Production Unit (LPPU). Client: PETRONAS Carigali (SKO). Scope: EPC. | LPPU |
| 2014 | MalaysiaAnjung Kecil, offshore Sarawak | Sep-iSYS™ crude stabilisation unit for the MaMPU FPSO. Client: MISC. Scope: EPC. | Crude stabilisation |
| 2014 | MalaysiaRotan, offshore Sabah | Three trains of the Sep-iSYS™ inlet production system, with the Sep-iSYS™ sand removal and sand wash systems. Client: PETRONAS. Scope: engineering and procurement. | Sep-iSYS™ |
| 2016 | MalaysiaAngsi, offshore Peninsular Malaysia | Sep-iSYS™ Low Pressure Production Unit (LPPU), two units. Client: PETRONAS Carigali (PMO). Scope: EPC. | LPPU |
| 2016 | MalaysiaAnjung Kecil, offshore Sarawak | Low Pressure Condensate Recovery System (LP-CRS) for the MaMPU FPSO. Client: MISC. Scope: EPC. | LP-CRS |
| 2017 | MalaysiaOphir, offshore Peninsular Malaysia | Sep-iSYS™ crude stabilisation unit for the Ledang FPSO. Client: MTC Engineering. Scope: EPC. | Crude stabilisation |
| 2017 | Malaysiaacross Malaysia | Umbrella contract for the supply and services of desander equipment and its accessories. Client: PETRONAS Carigali. Scope: concept, FEED, detailed design, EPC and operation. | Sep-iSYS™ Desander |
| 2017 | MalaysiaBokor, offshore Sarawak | Sep-iSYS™ CSRS bulk desander with a sand handling system. Client: PETRONAS Carigali (SKO). Scope: EPC. | Sep-iSYS™ Desander |
| 2018 | MalaysiaTembikai, offshore Peninsular Malaysia | Low Pressure Condensate Recovery System (LP-CRS). Client: Vestigo Petroleum. Scope: EPC. | LP-CRS |
| 2018 | MalaysiaNC3, offshore Sarawak | Condensate mercury removal skid. Client: HYDAC Technology / Sapura Energy. Scope: EPC. | Process package |
| 2018 | PhilippinesGaloc | Low Pressure Condensate Recovery System (LP-CRS) for the FPSO Intrepid. Client: Matahio Energy. Scope: EPC. | LP-CRS |
| 2023 | IndonesiaForel | Crude stabilisation module for the Marlin Natuna FPSO. Client: Consortium PT Hanochem Tiaka Samuedra / MedcoEnergi. Scope: EPC. | Crude stabilisation |
| 2023 | MalaysiaWest Lutong, offshore Sarawak | Low Pressure Production Unit and gas recovery system. Client: PETRONAS Carigali (SKO). Scope: EPCIC. | LPPU |
| 2023 | MalaysiaHelang, offshore Sarawak | Sep-iSYS™ CSRS compact desander. Client: ENEOS Xplora. Scope: FEED and EPC. | Sep-iSYS™ Desander |
| 2024 | VietnamBlock B | Condensate stabilisation package. Client: McDermott / Petrovietnam PQPOC. Scope: EPC. | Condensate stabilisation |
Nothing in this list for the selected country: see the other list.
Engineering and studies
| Year | Country | Scope | Technology |
|---|---|---|---|
| 2010 | Vietnam | Sep-iSYS™ and topside facilities of the TGT FPSO. Client: HLJOC. Scope: concept, FEED and detailed design. | Sep-iSYS™ |
| 2012 | India | Sep-iSYS™ and topside facilities of the D1 FPSO. Client: ONGC. Scope: concept, FEED and detailed design. | Sep-iSYS™ |
| 2012 | AustraliaBalnaves, Western Australia | Balnaves field FPSO. Client: Apache Energy. Scope: concept, FEED and detailed design. | Engineering |
| 2013 | Malaysiaoffshore Sarawak | Sep-iSYS™ Low Pressure Production Unit. Client: PETRONAS Carigali (SKO). Scope: concept, FEED and detailed design. | LPPU |
| 2013 | Malaysiaoffshore Sabah | Samarang redevelopment project phase 2 (SMP-C). Client: PETRONAS Carigali (SBA). Scope: detailed design. | Engineering |
| 2013 | MalaysiaKinabalu, offshore Sabah | Kinabalu platform debottlenecking. Client: Talisman Malaysia. Scope: concept. | Engineering |
| 2013 | IndonesiaKE-38, offshore Madura | Madura temporary production facility. Client: Gryphon Energy Asia Pacific. Scope: concept and detailed design. | Engineering |
| 2014 | MalaysiaK-5, offshore Sarawak | DRCF and GDU for pre-treatment and CO₂. Client: Honeywell UOP. Scope: concept, FEED and detailed design. | Engineering |
| 2014 | Angola | Cobalt piping and CAD drafting. Client: Bumi Armada. Scope: concept, FEED and detailed design. | Engineering |
| 2014 | MalaysiaTanjong Baram, offshore Sarawak | Topside engineering. Client: 2H Offshore Engineering. Scope: FEED and detailed design. | Engineering |
| 2014 | VietnamTGT FPSO | TGT FPSO capacity check and debottlenecking study (phase 1). Client: Bumi Armada. Scope: adequacy check. | Engineering |
| 2014 | VietnamTinh Gia district, Thanh Hóa province | Launcher and receiver for the crude oil import pipeline. Client: Wood Group Kenny. Scope: FEED. | Engineering |
| 2014 | NamibiaKudu | Kudu gas to power project. Client: Bumi Armada. Scope: concept, FEED and detailed design. | Engineering |
| 2015 | MalaysiaBertam, Peninsular Malaysia | Engineering services contract for Lundin Malaysia B.V. Client: Lundin Malaysia B.V. Scope: umbrella engineering. | Engineering |
| 2015 | IndonesiaMadura Strait | Engineering consultancy for the Husky Madura project. Client: Bumi Armada. Scope: detailed design. | Engineering |
| 2015 | Singapore | Computational fluid dynamics (CFD) and finite element analysis (FEA). Client: Jimmy Lea Chartered Engineers. Scope: detailed design. | Engineering |
| 2015 | PakistanGambat South Block | PPL Separex project. Client: Honeywell UOP. Scope: detailed design. | Engineering |
| 2015 | Saudi Arabia | TAIF project. Client: KNM Process. Scope: concept. | Engineering |
| 2015 | MalaysiaBokor, offshore Sarawak | Wellhead platform for the Bokor phase 3 redevelopment project. Client: Muhibbah Engineering / PETRONAS. Scope: FEED design competition. | Engineering |
| 2017 | SingaporeShell Bukom APSA T7 | Engineering and pipe stress support. Client: PEC. Scope: detailed design. | Engineering |
| 2017 | MalaysiaOphir, offshore Peninsular Malaysia | Umbrella contract for design engineering services. Client: Ophir Production. Scope: umbrella engineering. | Engineering |
| 2018 | MalaysiaTapis, offshore Peninsular Malaysia | Low Pressure Condensate Recovery System (LP-CRS). Client: ExxonMobil Exploration and Production. Scope: concept and FEED. | LP-CRS |
| 2018 | MalaysiaTemana, offshore Malaysia | Low Pressure Condensate Recovery System (LP-CRS). Client: PETRONAS Carigali (SKO). Scope: concept and FEED. | LP-CRS |
| 2018 | MalaysiaSarawak | Portable container station (PCS) dispenser skid. Client: OGPC. Scope: detailed design. | Engineering |
| 2018 | MalaysiaPort Dickson | Ultra low sulphur automotive diesel oil (ULSADO) project, Petron distillate Unionfining process. Client: Honeywell UOP. Scope: FEED. | Engineering |
| 2019 | MalaysiaWest Desaru, offshore Peninsular Malaysia | West Desaru Low Pressure Condensate Recovery System (LP-CRS). Client: Petrofac. Scope: FEED. | LP-CRS |
| 2019 | VietnamNam Du and U Minh | FPSO topside facility for the Nam Du and U Minh development. Client: HBA Offshore. Scope: FEED. | Engineering |
| 2019 | India | FPSO topside for the NELP block KG-DWN-98/2 development project. Client: Kavin Engineering / SPOG. Scope: detailed design. | Engineering |
| 2019 | MalaysiaBekok-A, offshore Peninsular Malaysia | Low Pressure Condensate Recovery System (LP-CRS). Client: Deleum Primera / PETRONAS Carigali (PMA). Scope: concept and FEED. | LP-CRS |
| 2019 | MalaysiaBertam, offshore Peninsular Malaysia | Produced water system upgrade (PWSU) for the wellhead platform and FPSO topside. Client: EPOMS. Scope: concept, FEED and detailed design. | Engineering |
| 2019 | MalaysiaWest Desaru, offshore Peninsular Malaysia | Low Pressure Condensate Recovery System (LP-CRS). Client: Petrofac. Scope: concept and FEED. | LP-CRS |
| 2019 | AustraliaNorthern Endeavour FPSO | Very low sulphur fuel oil (VLSFO) system for an FPSO. Client: Northern Oil and Gas Australia. Scope: concept and FEED. | Engineering |
| 2020 | MalaysiaTemana, offshore Malaysia | Installation of the Low Pressure Condensate Recovery System (LP-CRS) for Temana A. Client: PETRONAS Carigali (PCSB). Scope: detailed design. | LP-CRS |
| 2020 | MalaysiaSabah | FPSO Kikeh greenhouse gas emission reduction study. Client: MISC. Scope: concept select. | Engineering |
| 2020 | NigeriaOkwok | FPSO for the Okwok field development. Client: HBA Offshore. Scope: adequacy check. | Engineering |
| 2020 | Malaysiaoffshore Terengganu | Berantai gas development study and basic engineering. Client: Vestigo Petroleum. Scope: feasibility study and basic engineering. | Engineering |
| 2021 | Nigeria | Engineering for the Agogo full field FPSO project. Client: Shapoorji Pallonji Group. Scope: FEED design competition. | Engineering |
| 2021 | Brazil | Seawater injection, produced water treatment module and TEG package. Client: National Oilwell Varco / SBM. Scope: detailed design. | Engineering |
| 2021 | MalaysiaBentara | MaMPU 1 redeployment from the AJK field to the Bentara field. Client: MISC. Scope: detailed design. | Engineering |
| 2021 | MalaysiaLarut | Basic engineering for the Larut infill. Client: Vestigo Petroleum. Scope: basic engineering design. | Engineering |
| 2021 | MalaysiaLimbayong FPSO | Limbayong flare study. Client: Yinson. Scope: basic engineering design. | Engineering |
| 2022 | Brazil | Seawater injection, produced water treatment module and TEG package. Client: National Oilwell Varco / SBM. Scope: detailed design. | Engineering |
| 2023 | Brazil | Process engineering support for the P-82 FPSO topsides. Client: Ranhill Worley / Petrobras. Scope: detailed design. | Engineering |
| 2023 | Philippines | Feasibility study for an LP-CRS on the FPSO Intrepid. Client: Matahio Energy. Scope: feasibility study and basic engineering. | LP-CRS |
| 2023 | Australia | Basic engineering design of the reinjection compression system upgrade for the Montara Venture FPSO. Client: Jadestone Energy. Scope: basic engineering design. | Engineering |
| 2024 | MalaysiaTemana, offshore Malaysia | Engineering services for an LPPU and gas recovery system. Client: PETRONAS Carigali. Scope: FEED. | LPPU |
| 2025 | IndonesiaNorth Sumatra | Topside FEED for the FPSO Tangkulo. Client: Bumi Armada / Mubadala Energy. Scope: FEED. | Engineering |
| 2025 | VietnamBlock B | Engineering for the separator sand removal system. Client: Alpha ECC / McDermott. Scope: detailed design. | Engineering |
| 2026 | MalaysiaSarawak | Process capacity screening for the M1 facilities, Kenyalang tie-in concept. Client: Ankaa Consulting / TotalEnergies. Scope: adequacy check. | Engineering |
Nothing in this list for the selected country: see the other list.
From the yard to offshore
Our work, in pictures.

Our technology record
A proven record behind every technology.
Enhanced LPPU™ is an enhancement of the LPPU platform: three offshore LPPU installations across two fields, the first in 2014, now re-engineered with the liquid piston. Enhanced LP-CRS™ carries forward condensate-recovery experience. The Sep-iSYS™ Desander brings NGLTech’s separation logic into produced-sand duties, under intellectual property jointly owned with PETRONAS.
After delivery
The operating phase is part of the record.
Commissioning
Connect design intent to the real plant and its operating procedures.
Performance review
Read the operating data and resolve what it is actually saying.
Operator readiness
Training, documentation and clear handover around the package.
Lifecycle action
Maintenance, spares, upgrades and planned removal when required.
References
Ask for the closest reference.
Tell us the duty and the project stage. We’ll point you to the most relevant work we can share.